Sunday, March 26, 2023
No Result
View All Result
Afric Info
  • News
    • Cameroon
    • Egypt
    • Ethiopia
    • Ivory-Coast
    • Ghana
    • Kenya
    • Nigeria
    • South Africa
    • Sudan
    • Tanzania
    • Uganda
    • Zimbabwe
  • Health
  • Sports
  • Travel
  • News
    • Cameroon
    • Egypt
    • Ethiopia
    • Ivory-Coast
    • Ghana
    • Kenya
    • Nigeria
    • South Africa
    • Sudan
    • Tanzania
    • Uganda
    • Zimbabwe
  • Health
  • Sports
  • Travel
No Result
View All Result
Afric Info
No Result
View All Result
HomeNewsSouth Africa

South Africa: At Last Prasa Partly Opens Cape Town’s Central Line

March 17, 2023
inSouth Africa
Share on FacebookShare on Twitter


The service will run only from Nyanga to Maitland

  • Cape Town’s Central railway line, closed since 2019, is to partly re-open on Monday, says the Passenger Rail Agency of SA.
  • Trains will run only from Nyanga to Maitland, stopping at all stations except Netreg which is still being rebuilt.
  • For now, passengers going to the city centre will need to change trains at Maitland.

After a long wait, commuters will at last be able to use a train from Nyanga to Cape Town on Monday, when the Passenger Rail Agency of South Africa (PRASA) resumes service on part of the Central Line.

The new blue trains will run from Nyanga to Maitland and back, and commuters wishing to go to Cape Town will have to change trains at Maitland. The trains will stop at all stations on the way to Maitland except Netreg, where extensive damage to the station still has to be repaired.

A new blue train was tested on the route on Wednesday. GroundUp joined the train at Nyanga and watched as people living in houses greeted the train, taking pictures and running along beside the railway line.

Regional engineering manager Raymond Maseko told GroundUp that for now the train would not run all the way to Cape Town as final repairs were necessary to the line between Woodstock and Cape Town to prepare for the extra load.

“Once that section is fixed we will then be able to run all the trains all the way to Cape Town,” he said.

“After Nyanga the next line we are opening is the Northern Line, from Eerste River to Strand, and from Eerste River to Muldersvlei,” Maseko said. A limited service has been running between Eerste River and Bellville since January.

Except for a brief period, the Central line has been suspended since 2018 and completely closed since October 2019. This was the busiest line in Cape Town, serving the poorest communities, and used to serve Khayelitsha and Mitchells Plain.

After the line was closed, families moved onto the tracks and informal settlements sprang up along the railway in Langa, Philippi and Khayelitsha. Then, during lockdown in 2020 and 2021, infrastructure was stolen or badly vandalised. Nothing much was left of Netreg train station which was stripped of its roof, windows and doors.

Minister Fikile Mbalula promised that the Central line would be fully operational by the end of 2022, but commuters were sceptical after the widespread theft and destruction of infrastructure and previous missed deadlines. In July, a partial service restarted on the Pinelands to Bellville line via Langa, Bonteheuwel and Belhar.

Maseko said tests on the Central Line had taken months. The line had been tested, using old yellow trains, before the new blue trains were allowed to run on the line. The final tests with the new blue trains were nearly complete.

“The new blue trains have got what we call electronic measurements. They are able to tell us how the train and the infrastructure interact and this is why these technical people you see inside the train are watching closely as the train is moving. When we go back to the office, we will download the data and check how the train and the infrastructure interact. If we have to do last minute adjustments, we will.”

“Today is the last day of the test. We have brought in the railway safety regulator to have a look at the rehabilitated network and rehabilitated stations. So we hope by Friday we get the go-ahead, so that on Monday trains can start operating.”

Commenting on the stations, Maseko said, “All these platforms at Nyanga station were severely vandalised. There was absolutely nothing. You see the amount of work we have put in. We are re-doing everything from scratch because during Covid-19 everything was destroyed.”

Sign up for free AllAfrica Newsletters

Get the latest in African news delivered straight to your inbox


Success!

Almost finished…

We need to confirm your email address.

To complete the process, please follow the instructions in the email we just sent you.


Error!

There was a problem processing your submission. Please try again later.

He said trains would not stop at Netreg because of serious damage to the station. “At Netreg there is structural damage. In other stations we had only damage such as lighting, water in toilets and copper pipes which we have been replacing. Netreg is a different story. We are fixing everything from scratch.”

Asked about the resettlement of the people living on PRASA land in Langa, Philippi and Khayelitsha, he said PRASA’s mandate was to run trains, and the Department of Human Settlements, the City of Cape Town and the Housing Development Agency were trying to secure land to relocate people occupying the track.

People living on the railway reserve in Langa were meant to have been relocated last year in November, but PRASA and the City have blamed each other for delays.

ADVERTISEMENT



Source link : https://allafrica.com/stories/202303160355.html

Author : [email protected] (GroundUp)

Publish date : 2023-03-16 12:17:06

Tags:south africa
Previous Post

Africa Can Feed Itself, the World

Next Post

Nigeria: NCC Urges Telcos to Adopt Renewable Energy to Minimise Cost

Last News

Bulls stumble after promising start against Ulster, fall to another URC loss – News24

3 hours ago

United Rugby Championship: Glasgow Warriors secure impressive 38-26 win over Munster – bbc.co.uk

5 hours ago

Sharks suffer third straight URC loss after scrappy defeat to Scarlets – News24

6 hours ago

SECTION 194 IMPEACHMENT INQUIRY: Toxic cloud of secrets and lies over 2013 Zuma-Putin nuclear deal hovers above Busisiwe Mkhwebane’s historic legal battle – Daily Maverick

6 hours ago

Cape Epic 2023 | Stage 6 ride report – a muddy MTB nightmare – News24

7 hours ago

Given Msimango: Kaizer Chiefs beat Orlando Pirates to sign TS Galaxy skipper – reports – Goal.com

7 hours ago

Tearful Springbok Kolbe suffers injury for Toulon – News24

7 hours ago

Windies skipper smashes his side to T20 win over South Africa – CNA

7 hours ago

Categories

No Result
View All Result
  • Africa News

© 2022 AFRICC.info.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.
Go to mobile version

South Africa: At Last Prasa Partly Opens Cape Town’s Central Linehttps://www.moncafe.biz  https://www.0news.net/  https://www.climatiseurs-et-ventilateurs.com  https://www.drone-forum.fr  https://www.afric.info  
Warriors decide not to pursue grievance against Blazers over Gary Payton II injury * Pochette Téléphone Portable Etanche Sac Tactique Militaire Molle, Sports de plein air Sac EDC Multifonctions Accessoires… * Veuve Clicquot Brut Yellow Label Jeroboam Champagne 3 lt. *  *-*Macron distille son analyse de la crise avant les 13H, 12 % des stations-service en difficulté, manifs nocturnes contre la réforme des retraites… L’actu de ce mercredi matin * Miami Open: Dan Evans and Coco Gauff among seeds to fall * DR PHILIPPA KAYE: Sure, our breasts do head south in midlife – Every day Mail *  -*-https://www.moncafe.info  https://www.100-chaussures.com  https://www.poupees-dolls.com  https://travel-mag.info  https://www.e-lingerie.net/  https://www.chaussure.biz  https://www.humanrightsiniran.org  https://climatiseurmobile.org  South Africa: At Last Prasa Partly Opens Cape Town’s Central Line*South Africa: At Last Prasa Partly Opens Cape Town’s Central Line